Yunus Emre Power plant (previously Adularya) revitalisation (2 x 145 MWe) | Yildizlar Holding Group | CFB coal fired power plant | Turkey, Ankara region | 5.2023 |
Manufacturing drawings of the water heater for the CHELM cement plant | Euro Energy Slovakia | Manufacturing drawings of the water heater | Slovak republic | 9.2022 |
DECAGONE Project – ORC innovative technology development. | Trinecke Zelezarny a.s., Trinec | ORC | Czech republic, TŽ Trinec | 6.2022 |
Provision of Engineering Support TG8 Retrofit. | Mondi Štětí | District Heating station | Czech republic, Štětí | 2.2022 |
A new source for the combined production of electricity and heat for the continuous operation of the Metallurgical Plant PJSC MMK. | IEG, ŽDAS | Boilers, Turbogenerators, Turbocompresors, BoP | Russia, Metallurgical Plant PJSC MMK | 5.2021 |
Due diligence report
• Equipment for catalytic oxidation of waste
• Equipment for the production of hydrogen and fuels from waste
| CEE Capital
| Gasification of waste | Slovak republic, Sereď | 4.2021 |
Various studies – optimisation of the DH station | Client not published
| | not published yet | 8.2020 |
Construction supervision, role of FIDIC engineer for the Project in Zvolenska Teplarenska a.s., Zvolen | Zvolenska Teplarenska a.s., Zvolen
| | Slovak republic, Zvolen | 5.2020 |
Elaboration of implementation, documentation for construction: “Recycling of waste paper for the purpose of paper production / testliner / - Bukoza Vranov nad Topľou | Bukoza Vranov nad Topľou
| | Slovak republic, Vranov nad Topľou | 12.2019 |
P&ID´s assessment for Unit No. 3 & 4 of NPP EMO Mochovce | ROEZ, a.s., Levice | Nuclear | Slovakia, Nitra | 1.2018 |