• Assignment name

    Reconstruction converter gas cleaning piping systems in Steel & Iron company TŽ a.s. Třinec, Czech Republic

    Name of the client

    Třinecké železárny, a.s., Třinec

    Short description

    Detail design of overall reconstruction of LP and HP circulation piping systems related to the convertor systems including all relevant civil, electric and I&C systems.

    Services provided by company

    FE prepared and issued related documentation in Basic and Detail engineering phase of project and following framework of disciplines has been coordinated:

    • Process engineering
    • Mechanical engineering
    • Civil Engineering
    • I&C and Electrical systems The Basic Design (BD) elaborated by FE set up and developed the main scope of services and the interfaces between particular disciplines and battery limitsin terms of specific requirements of client for operation and maintenance. The Basic Design summarized all necessary technical information as the basis for execution of further Detail Design (DD) of the plant and covered following scope of works:
    • Basic process data and heat balance calculations by means of available documents and existing operation practise
    • Basic design and load data
    • Process flow diagrams
    • 3D-Model
    • Basic arrangement and layout drawings
    • Basic technical specification
    • Suspension and Support concept
    • I&C and electrical part concept
    • Typical look-up diagrams The Detail Design (DD) included review and confirmation of BD results of all engineering and design services from the basic design (BD) phase and comprised as bellow :
    • Final heat balance diagrams for various operation and transient operation cases
    • 3D Model
    • P&I diagrams
    • Detail arrangement drawings of components (tanks, heat exchangers, headers etc.
    • Detail layout drawing of plant ( platforms and sections)
    • Dimensional check drawings
    • Isometric drawings of pipelines
    • Data sheets ( Vesels, Heat exchangers, Control Valves etc. )
    • Static stress calculations
    • Final technical specification ( valve list, List of lines, List of main equipments, List of hangers and supports ...
    • Pipe stress analyses
    • Bill of material
    • Purchase specification
    • Demolition and erection procedures
    • I&C and electrical part documents (List of electrical consumers, List of measuring points) The Technical Advisory (TA) for the Clint includes technical support in tendering phase, Bid review and evaluation for manufacturing and delivery.

  • Country, location within country

    Czech Republic, Třinec

    Date beginning/completion

    9.2013 - 8.2017

    Technology

    Type of service

    TA

    Staff involved in the project

    ADAM Dominik

    ARENDAS Vladimir

    KATAY Tibor

    MALIK Drahomir

    SOJCAK Dusan

    VALACH Branislav