Assignment name
Feasibility study - Modernization of heat sources in Continental Matador Rubber s.r.o., Púchov, Slovakia
Name of the client
Continental Matador Rubber s.r.o., Púchov, Slovakia
Short description
The Clients intention was to modernize the heating sources in the existing factory, based on analysis and evaluation of proposed alternatives in order to replace the existing heating sources. The following alternatives were technically and economically evaluated: new complete fire-tube boilers, new heat recovery steam generator with accessories installed downstream new 18 MW combustion turbine, new heat recovery steam generator with accessories installed downstream new 15 MW combustion turbine.
Services provided by company
Technical and commercial analysis of the present operation of the factory, examination of the auxiliary technology and its suitability for future operation, basic Concept Layouts for each Alternative and their evaluation, including principled schemes, media consumptions, risk analysis, etc. The results of the study were supported by economic analysis of each Alternative.
Technical data
18 MW combustion turbine and 15 MW combustion turbine
Country, location within country
Slovakia, Púchov
Date beginning/completion
4.2013 - 5.2013
Technology
Modernization of heat sources
Type of service
FS
Staff involved in the project
ARENDAS Vladimir
SOJCAK Dusan