Assignment name
Due Diligence of reasons and consequences of the plant accident Technical advisory services during project rehabilitation Owner´s engineering activity
Name of the client
WtE plant, Kosit a.s. Košice, Slovakia
Short description
Evaluation of reasons and consequences of the plant accident (steam turbine & generator technical failure and fire in Waste to Energy plant), preparation of technical report for arbitrary case
Services provided by company
Report elaboration for the client was based on evaluation of
- Physical inspection of the plant after accident
- Assessment of existing technical reports related to the inspections performed by other third parties
- Analysis and evaluation of process parameters recorded by DCS at the time of accident and/or records from operation (log books) with the aim to identify root cause of the accident and possible course of process before, during and after event
- Assessment and evaluation of former contractor´s documentation related to the project execution since its beginning up to now
- Preparation of technical report with results of assessment
- Support to the Client in preparation of arbitrary case proceedings with former EPC contractor Site supervision and Technical assistance during rehab works at the plant
- Design review
- Erection and commissioning supervision and advisory for the Client
Country, location within country
Slovakia, Košice
Date beginning/completion
9.2015 - 8.2017
Technology
Waste to Energy plant
Type of service
TA OE
Staff involved in the project
ARENDAS Vladimir
KOTRUS Marian