• Assignment name

    CCGT / CO2 Capture Plant Karsto / Norway - CCGT Naturkraft 420MW

    Name of the client

    FICHTNER GmbH , GASSNOVA

    Short description

    The Norwegian Ministry of Petroleum and Energy (OED) is planning a retrofit CO2 capture facility at the Kårstø gas-fired power plant located in the South-West of Norway. The objective is to reduce the emissions from the power plant with up to 1 000 000 tones CO2 per year. The captured CO2 will be compressed, liquefied and ready for pipeline transport. A project team has been established. The current project task/mandate is to prepare all information needed before a final investment decision to be taken by The Norwegian Parliament in the fall 2009. The project is called “CO2 Kårstø” and reports to the state owned Gassnova SF.

    Services provided by company

    Scope of responsibilities: Flue Gas, LP Steam, HP steam, Return condensate, Natural gas, Electrical / I & C Tie/in, Firewater, Potable water, Sewage Water, Cooling water – in / out, Site preparation and temporary roads, Lay-down & preassembling areas, New module roads, Signals, Fence Scope of services:

    • Equipment arrangement optimisation
    • Participation in investigation of solutions for fulfilling of fail / safe operation
    • Steam and condensate return, as well as the cooling water concept and demand will comprise:
    • Checking of heat balance calculations and evaluation of possible optimizations in terms of steam extraction and condensate return;
    • Investigation of the optimized cooling water concept taking into account the existing system;
    • Initiate calculations for the power losses under various ambient conditions (pressure, temperature ), taking into account the correction curves of the CCPP.
    • Investigate the most appropriate routing for the power cable from the CCPP to the CCC plant for construction and operation period;

    Technical data

    420MWe CCGT

  • Country, location within country

    Norway, Karsto

    Date beginning/completion

    2.2009 - 2.2010

    Technology

    CO2 Capture Plant

    Type of service

    TA OE

    Staff involved in the project

    ADAM Dominik