• Assignment name

    Integrated Solar Combined Cycle Power Plant ISCC Kuraymat, Egypt

    Name of the client

    FICHTNER GmbH, Arab Republic of Egypt, Ministry od Electricity and Energy, New and Renewable Energy Authority „NREA“

    Short description

    The Project comprises two gas turbines of 40 MWe each, one steam turbine of 70 MWe, one parabolic trough solar field capable to generate about 200 GWh/a (thermal) of solar heat plus.

    Services provided by company

    Interface / BOP Engineer

    • Design review of the Interfaces and Balance of plant (BOP). Monitor the interface and BOP activities and responsibility for correctness of related auxiliary systems. Electrical Engineer
    • Design review of the Electrical System such as HV transformers, generator and other HV equipment. Monitoring of the electrical equipment erection activities and responsibility for the correctness of its installation. Making sure that the contractual performance standards and time schedule were being followed. Review of the related commissioning program and supervising the main commissioning activities in order to verify contractually agreed performance and guarantee values. I&C Engineer
    • Review of the design of I&C System including DCS system. Monitoring of the main related erection activities and make sure that the I&C equipment was installed according to the contractual performance standard and time schedule. Review the related commissioning program and supervising the main commissioning activities in order to verify contractually agreed performance and guarantee values.

    Technical data

    40MWe gas turbines each, 70MWe steam turbine, 200GWh/a thermal

  • Country, location within country

    Egypt, Kuraymat

    Date beginning/completion

    3.2010 - 9.2010

    Technology

    Solar Plant

    Type of service

    TA OE

    Staff involved in the project

    MACAJ Branislav