Assignment name
Integrated Solar Combined Cycle Power Plant ISCC Kuraymat, Egypt
Name of the client
FICHTNER GmbH, Arab Republic of Egypt, Ministry od Electricity and Energy, New and Renewable Energy Authority „NREA“
Short description
The Project comprises two gas turbines of 40 MWe each, one steam turbine of 70 MWe, one parabolic trough solar field capable to generate about 200 GWh/a (thermal) of solar heat plus.
Services provided by company
Interface / BOP Engineer
- Design review of the Interfaces and Balance of plant (BOP). Monitor the interface and BOP activities and responsibility for correctness of related auxiliary systems. Electrical Engineer
- Design review of the Electrical System such as HV transformers, generator and other HV equipment. Monitoring of the electrical equipment erection activities and responsibility for the correctness of its installation. Making sure that the contractual performance standards and time schedule were being followed. Review of the related commissioning program and supervising the main commissioning activities in order to verify contractually agreed performance and guarantee values. I&C Engineer
- Review of the design of I&C System including DCS system. Monitoring of the main related erection activities and make sure that the I&C equipment was installed according to the contractual performance standard and time schedule. Review the related commissioning program and supervising the main commissioning activities in order to verify contractually agreed performance and guarantee values.
Technical data
40MWe gas turbines each, 70MWe steam turbine, 200GWh/a thermal
Country, location within country
Egypt, Kuraymat
Date beginning/completion
3.2010 - 9.2010
Technology
Solar Plant
Type of service
TA OE
Staff involved in the project
MACAJ Branislav