• Assignment name

    Coal Fired Power Plant with CFB Boiler Bana Cary, Slovakia

    Name of the client

    E.ON Slovakia / Západoslovenská Energetika a.s. Bratislava

    Short description

    Preliminary technical-economical evaluation of feasibility study of Coal Fired Power Plant Bana Cary - Alternative IVb (Coal fired Power Plant with CFB boiler and average unit load 100 MWe with anticipated operation period 8000 working hours)

    Services provided by company

    Technical and economical evaluation of feasibility study

    • Checking and correction unit balance features as additive consumption, additional cooling water necessity, thermal efficiency of the boiler, etc
    • Evaluation of technical solutions as main technological, electrical, I&C equipment design, civil design, etc.
    • Economical evaluation
    • Financial analysis and calculation of main economical indicators
    • Technical – economical evaluation of considered options
    • Time schedule revision proposal
    • Final recommendation

    Technical data

    Coal fired Power Plant with CFB boiler and average unit load 100 MWe with anticipated operation period 8000 working hours

  • Country, location within country

    Slovakia, Western Slovakia

    Date beginning/completion

    7.2008 - 10.2008

    Technology

    Coal PP

    Type of service

    FS

    Staff involved in the project

    ADAM Dominik

    KOTRUS Marian

    MALIK Drahomir